The CoMPAS project was formed as the first project in LF Energy’s Digital Substation SIG. The primary goal of the CoMPAS project is to develop open source software components related to IEC 61850 model implementation, specifically for profile management and configuration of a power industry Protection Automation and Control System (PACS).
CoMPAS (Configuration Modules for Power industry Automation Systems) is being developed using several guiding principles, including the use of cross-platform Docker-based microservices along with a lightweight browser client, multiple language support for the user interface, scriptable controls, and the ability to integrate third-party tools.
Project Lifecycle Stage
Early Adoption
Project Special Interest Group
Digital Substations
Objectives
CoMPAS is designed to provide common software blocks for IEC 61850 profile configuration, using an open source shared development model. Building on development resources provided by multiple vendors, end-users, and other stakeholders results in rapid development and an end result that meets stakeholders’ needs. This open source initiative uses – and creates – industry best practices for top-down configuration processes and common model implementation choices, accelerating conformity to IEC 61850 through software implementation.
The project does not duplicate standardization efforts. Instead, CoMPAS’s goal is to deliver a production-grade reference implementation of the IEC standard. When the rules and principles from the standard are not comprehensive or specific enough or are still a work in progress, the project makes choices for the implementation based on the primary goal of a configurable and flexible implementation that follows the standard.
Main Use Cases
CoMPAS is designed around the following primary use cases:
- Tools for IEC 61850 profile management and configuration are needed at various business processes of the power grid industry
- The planning process for grid infrastructure components facilitates the design of power system adaptations and the engineering of substation PACS to be installed or upgraded
- Specifying requirements and performing multi-vendor system integration and commissioning during the PACS procurement and delivery phase
- Adapting to changes in operational conditions and performing system configuration updates during the operational life of PACS
- Managing assets in order to perform maintenance actions and PACS upgrades
Additionally, there is a demand for better availability of Substation PACS data at the enterprise level – functions & settings and operational process data – and enhanced interoperability between processes at substation and enterprise levels through stronger automation:
- Improving the interlinkage between grid planning and PACS engineering processes
- Improving the interlinkage between the configuration of PACS and the configuration of central systems, including SCADA and asset management
Resources
Related Posts
SEAPATH Becomes LF Energy’s First Graduated Project
SEAPATH has become the first project in LF Energy’s history to reach the Graduated stage. Grid2Op and OpenGridFM have been approved to move to Incubation, while CoMPAS moves to Early Adoption. LF Energy’s project lifecycle sets milestones and requirements for projects as they develop. With its move to Graduation, SEAPATH enters the stage for projects…
LF Energy Announces New Members, Expanded Governing Board, and Record Event Attendance for 2025
Foundation updates point to continued growth and heightened value of open source software for energy resiliency SAN FRANCISCO, December 18, 2025 – LF Energy, the open source foundation accelerating the energy transition, celebrates significant growth in 2025, including new members, new projects, and record-setting event attendance. These additions to the LF Energy community strengthen the…
LF Energy Summit Recap and Video: CoMPAS and Beyond: Simplifying IEC61850
At 2024 LF Energy Summit in Brussels, Pascal Wilbrink from OpenValue Arnhem delivered an insightful presentation titled “CoMPAS and Beyond: Simplifying IEC61850.” Wilbrink, a software developer, discussed the complexities of the IEC61850 standard and how CoMPAS - a project under the LF Energy umbrella - is streamlining the editing of Substation Configuration Language (SCL) files…
Linux Foundation Energy Restructures Project Ecosystem, While Welcoming New Members From the Technology and Electrical Utility Communities
Open source foundation announces its latest initiatives to accelerate the energy transition during its flagship LF Energy Summit in Brussels BRUSSELS – 5 September 2024 – LF Energy, the open source foundation focused on harnessing the power of collaborative software and hardware technologies to accelerate the energy transition, is pleased to announce the formation of…
Dive into the Future of Energy Management with LF Energy’s CoMPAS Plug-in Tutorial
In a recent video tutorial presented by Sander Jansen of Alliander, viewers are taken on an insightful journey into the world of energy management with LF Energy's CoMPAS project plug-in for Siemens SITIPE. Here's a sneak peek into what the tutorial covers, and you can watch the full video tutorial below. Introduction to CoMPAS Plug-in…
Related Videos
CoMPAS Tutorial: Logical node type specification with CoMPAS
CoMPAS Essentials: Key To Simplicity - David Monichi & Stefan Baumgartner, BearingPoint







Webinar: Guided Substation Engineering with CoMPAS: Simplifying IEC 61850
December 4, 2025 4:28 am